Studying the engineering and technical challenges, as well as supply-related issues, for the Bab Tripoli project
DOI:
https://doi.org/10.65405/sjh.2.4.175Keywords:
Bab Tripoli project; engineering challenges; supply chains; stalled projects; construction project management.Abstract
This research aims to examine the engineering and technical challenges, as well as the supply chain issues, encountered by the Bab Tripoli project in Libya—one of the country’s largest stalled development projects. The study employs a descriptive-analytical approach, drawing upon official reports and academic studies concerning the Libyan construction sector. It includes technical assessments of the construction materials used and an evaluation of the efficiency of on-site engineering equipment. Furthermore, interviews were conducted with the engineering teams responsible for supervision and execution to analyze the technical and logistical problems affecting daily construction operations. The research concludes that engineering challenges—stemming from the project’s forced ten-year suspension—combined with complex supply chain issues, constitute the primary obstacles to its completion. The findings also indicate that political and financial factors rank as the most significant risks affecting construction projects in Libya. The study emphasizes the necessity of an integrated approach that combines technical and managerial solutions to ensure the project's success, and it offers practical recommendations to help overcome these challenges.
References
A critical examination of current planning practices in post-conflict housing reconstruction in Iraq. (2025). ScienceDirect.
Aljadr, A. A. A., & Khalefa, A. A. A. (2025). The causes of construction delays in Libya and identify possible solutions to avoid or reduce the delay in projects. Sabratha Journal for Marine and Comprehensive Sciences, 1(الأول), 29–55.
Assessing the impact of engineering project performance on strategic orientation within the Libyan local market. (2025). e-Marefa.
Audit Bureau head Shakshak discusses strategic Tripoli Gate 2 "Zumurrud" project. (2024, July 24). Libya Herald.
LIA invests in stalled LIDCO Tripoli Gate project – restarting construction sector projects. (2021, September 8). Libya Herald.
Risk prioritization in Libyan construction projects using FAHP: political and financial drivers in a fragile environment. (2026). Directory of Open Access Journals.
Smart management of the reconstruction process of post-conflict cities. (2025). ScienceDirect.
Supply Chain Resilience: Sourcing Construction Materials for Libya from a Regional Hub. (2026). Dorce – Prefabricated & Construction.
Sylejmani, M. (2026). Analyzing Construction Delays in Post-Conflict Economies: An Empirical Study of Causes and Mitigation Strategies in the Western Balkans. Turkish Journal of Engineering, 10(1).
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Shihab Journal of Humanities

This work is licensed under a Creative Commons Attribution 4.0 International License.
License
Copyright (c) 2026 Shihab Journal of Humanities

This work is licensed under a Creative Commons Attribution 4.0 International License.